<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>May Road Archives - Shop in Seagoville</title>
	<atom:link href="https://www.shopinseagoville.com/tag/may-road/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.shopinseagoville.com/tag/may-road/</link>
	<description>Your Hometown Shopping Connection</description>
	<lastBuildDate>Tue, 11 Aug 2026 16:06:22 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.shopinseagoville.com/wp-content/uploads/2026/06/shop_seagoville_favicon_512-150x150.png</url>
	<title>May Road Archives - Shop in Seagoville</title>
	<link>https://www.shopinseagoville.com/tag/may-road/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>May Road Closure Begins August 11 as Phase 1 Construction Starts</title>
		<link>https://www.shopinseagoville.com/2026/08/11/may-road-closure-begins-august-11-as-phase-1-construction-starts/</link>
					<comments>https://www.shopinseagoville.com/2026/08/11/may-road-closure-begins-august-11-as-phase-1-construction-starts/#respond</comments>
		
		<dc:creator><![CDATA[Shop in Seagoville]]></dc:creator>
		<pubDate>Tue, 11 Aug 2026 16:06:22 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<category><![CDATA[May Road]]></category>
		<category><![CDATA[Pavecon]]></category>
		<category><![CDATA[road closure]]></category>
		<category><![CDATA[Seagoville construction]]></category>
		<category><![CDATA[Seagoville Road Work]]></category>
		<category><![CDATA[Seagoville Traffic]]></category>
		<category><![CDATA[Seagoville TX]]></category>
		<category><![CDATA[traffic detour]]></category>
		<guid isPermaLink="false">https://www.shopinseagoville.com/?p=4156</guid>

					<description><![CDATA[<p>Seagoville drivers will need to plan ahead starting Tuesday, August 11, when Phase 1 of a two phase construction project closes May Road to through traffic. According to a traffic control plan filed by contractor Pavecon and prepared by Site Barricades, the closure is expected to last approximately six weeks. What Is Closing The plan [&#8230;]</p>
<p>The post <a href="https://www.shopinseagoville.com/2026/08/11/may-road-closure-begins-august-11-as-phase-1-construction-starts/">May Road Closure Begins August 11 as Phase 1 Construction Starts</a> appeared first on <a href="https://www.shopinseagoville.com">Shop in Seagoville</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="flex-1 flex flex-col px-4 max-w-3xl mx-auto w-full pt-1">
<div role="feed" aria-label="Chat messages" aria-describedby="_r_i6_" data-find-provider-scope="">
<div data-sizer-excess="0" data-rocksteady-sizer="">
<div data-rs-index="3" data-index="3" data-last-message="true">
<div tabindex="0" role="article" aria-setsize="4" aria-posinset="4" aria-label="Message 4 of 4">
<div data-test-render-count="1">
<div class="group group/message-row">
<div class="contents">
<div class="group relative relative pb-[var(--msg-assistant-pb,0.75rem)]" data-is-streaming="false">
<div class="font-claude-response relative leading-[1.65rem] [&amp;_pre&gt;div]:bg-bg-000/50 [&amp;_pre&gt;div]:border-0.5 [&amp;_pre&gt;div]:border-border-400 [&amp;_.ignore-pre-bg&gt;div]:bg-transparent [&amp;_.standard-markdown_:is(p,blockquote,h1,h2,h3,h4,h5,h6)]:pl-2 [&amp;_.standard-markdown_:is(p,blockquote,ul,ol,h1,h2,h3,h4,h5,h6)]:pr-8 [&amp;_.progressive-markdown_:is(p,blockquote,h1,h2,h3,h4,h5,h6)]:pl-2 [&amp;_.progressive-markdown_:is(p,blockquote,ul,ol,h1,h2,h3,h4,h5,h6)]:pr-8">
<div>
<div class="standard-markdown grid-cols-1 grid [&amp;_&gt;_*]:min-w-0 gap-3 [&amp;_&gt;_*:last-child]:mb-0 print:block print:[&amp;_&gt;_*_+_*]:mt-3 standard-markdown">
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">Seagoville drivers will need to plan ahead starting Tuesday, August 11, when Phase 1 of a two phase construction project closes May Road to through traffic. According to a traffic control plan filed by contractor Pavecon and prepared by Site Barricades, the closure is expected to last approximately six weeks.</p>
<h3 class="font-claude-response-body break-words whitespace-normal" dir="ltr"><strong>What Is Closing</strong></h3>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">The plan shows May Road closed to through traffic in the residential area near May Road Circle, Baylee Street, Trent Street, Julie Street and Bluffview Drive. Access points at Parkhaven Drive, Hillhaven Drive and Woodhaven Drive are also affected by work zone signage in the area.</p>
<h3 class="font-claude-response-body break-words whitespace-normal" dir="ltr"><strong>Detour Route</strong></h3>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">A signed detour loops around the closed work zone using Huddleston Court, East Farmers Road and Alto Road on the north and west side of the neighborhood, connecting through Hall Road and the US 175 Frontage Road on the east side. Drivers should watch for orange work zone signage and Type III barricades marking the detour along the route.</p>
<h3 class="font-claude-response-body break-words whitespace-normal" dir="ltr"><strong>Work Zone Details</strong></h3>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">Per the filed plan, traffic control devices are spaced on 30 foot centers throughout the work zone. The plan is labeled Phase 1 of 2, meaning residents should expect an additional phase of work once this stage is complete. A specific timeline for Phase 2 has not been confirmed as of this writing.</p>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">The City of Seagoville has not published additional project details, such as the scope or purpose of the work, beyond the traffic control plan reviewed for this report. Residents with questions can contact Seagoville City Hall at 972.287.2050 or check ongoing updates at seagoville.us.</p>
<h3 class="font-claude-response-body break-words whitespace-normal" dir="ltr"><strong>Plan for Delays</strong></h3>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr">Residents who live on or near May Road, May Road Circle, Baylee Street, Trent Street, Julie Street, Bluffview Drive, Parkhaven Drive, Hillhaven Drive and Woodhaven Drive should build in extra travel time during the closure and follow posted detour signage rather than relying on GPS routing, which may not reflect the temporary closure.</p>
<p class="font-claude-response-body break-words whitespace-normal" dir="ltr"><em>This article will be updated if the City of Seagoville publishes additional details on the May Road project.</em></p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<p>The post <a href="https://www.shopinseagoville.com/2026/08/11/may-road-closure-begins-august-11-as-phase-1-construction-starts/">May Road Closure Begins August 11 as Phase 1 Construction Starts</a> appeared first on <a href="https://www.shopinseagoville.com">Shop in Seagoville</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.shopinseagoville.com/2026/08/11/may-road-closure-begins-august-11-as-phase-1-construction-starts/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
